Murshidabad Zilla Parishad
মুর্শিদাবাদ জেলা পরিষদ
Murshidabad Zilla Parishad — current and previous scheme records
| # | Scheme | Work Name | Year | NIT / NIQ & Work Order | Amount | Area / Block | Progress | Beneficiaries | Agency | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Repairing of road from Balia more to Jasimuddin's house at Nayandanga under Sagardighi Block (Part-B), Murshidabad |
2019-20 |
NIQ46/2019-20, Sl.no 3 · 05/03/2020
|
— | Sagardighi |
PhysCompleted Road
FinCompleted
|
25000 | ZP | Completed |
| 2 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Repairing of road from Balia to Jasimuddin's house at Nayandanga under Sagardighi Block (Part-A) |
2019-20 |
NIQ46/2019-20 , Sl.no - 02 · 05/03/2020
|
— | Sagardighi |
PhysColeted
FinRs 1.97118 lakh
|
25000 | ZP | Completed |
| 3 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Repairing of road from Balia more to Kabilpur GP under Sagardighi Block |
2019-20 |
NIQ46/2019-20 Sl.no 01
|
— | Sagardighi |
PhysCompleted
FinRs. 1.68587 lakh
|
20000 | ZP | Completed |
| 4 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Provide the electrification work of SGSY Training Cente at Raghunathganj under Msd. Zilla Parishad |
2019-20 |
NIQ8/2019-20 ,Sl no-04 · 26/08/2019
|
— | Raghunathganj I |
PhysCompleted
Fin20.20710 LAKH
|
50000 | ZP | Completed |
| 5 |
Own Fund / renovation of traditional water bodies including desilting of Tanks;
Previous
|
Boring Sub- Mersible Pump arrangement at Murshidabad Zilla Parishad Office Premises, Berhampore, Murshidabad |
2019-20 |
NIQ12/2019-20 ,Sl no-3 · 09/08/2019
|
— | Berhampore |
PhysCompleted
Fin1.50463 lakh
|
50000 | ZP | Completed |
| 6 |
Own Fund / renovation of traditional water bodies including desilting of Tanks;
Previous
|
Installation of Ordinary tube well on staff quarter [Dibakar Mondal within Murshidabad Zilla Parishad Office Compound. Berhampore.Msd. |
2019-20 |
NIQQuotation · 27/08/2019
|
— | Berhampore |
PhysCompleted
Fin.17391 lakh
|
N/A | ZP | Completed |
| 7 |
Own Fund / Public Building Const
Previous
|
Repair and Renovation of Quarter at Filature Compound of Murshidabad Zilla Parishad, Panchanantala,Msd [Quarter no-1] |
2019-20 |
NIQ11/2019-20 ,SL.NO 06 · 23/07/2019
|
— | Berhampore |
PhysOngoing
Fin5.70059 lakh
|
50000 | ZP | Ongoing |
| 8 |
Own Fund / Public Building Const
Previous
|
Repair and Renovation of Quarter at Filature Compound of Murshidabad Zilla Parishad, Panchanantala,Msd [Quarter no-5, Excluding Electrical Work |
2019-20 |
NIQ11/2019-20,Sl no 10 · 23/07/2019
|
— | Berhampore |
PhysOngoing
Fin4.89028 Lakh
|
50000 | ZP | Ongoing |
| 9 |
Own Fund / Public Building Const
Previous
|
Repair and Renovation of Quarter at Filature Compound of Murshidabad Zilla Parishad, Panchanantala,Msd [Quarter no-4, Excluding Electrical Work |
2019-20 |
NIQ11/2019-20 ,Sl.no 09 · 23/07/2019
|
— | Berhampore |
PhysOngoing
Fin6.69592 lakh
|
50000 | ZP | Ongoing |
| 10 |
Own Fund / Public Building Const
Previous
|
Repair and Renovation of Quarter at Filature Compound of Murshidabad Zilla Parishad, Panchanantala,Msd [Quarter no-3, Excluding Electrical Work |
2019-20 |
NIQ11/2019-20 ,SL.NO 08 · 23/07/2019
|
— | Berhampore |
PhysOngoing
Fin7.35746 lakh
|
50000 | ZP | Ongoing |
| 11 |
Own Fund / Public Building Const
Previous
|
Repair and Renovation of Quarter at Filature Compound of Murshidabad Zilla Parishad, Panchanantala,Msd [Quarter no-2, Excluding Electrical Work |
2019-20 |
NIQ11/2019-20 ,SL.NO 02 · 23/07/2019
|
— | Berhampore |
PhysOngoing
Fin7.30485
|
50000 | ZP | Ongoing |
| 12 |
Own Fund / Public Building Const
Previous
|
Construction of boundry wall at Filature compound under Murshidabad Zilla Parishad |
2019-20 |
NIQ11/2019-20 ,SL.NO 02 · 23/07/2019
|
— | Berhampore |
PhysCompleted
Fin1.63259
|
50000 | ZP | Completed |
| 13 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Repair and Renovation of Addl. Chief Judicial Magistrate & Session Judge [2nd Court],Jangipur at Officers quarter at Murshidabad Zilla Parishad Dukbunglow complex under Raghunathganj -I Block ,Msd |
2019-20 |
NIQ13/2019-20 ,Sl no- 22 · 09/08/2019
|
— | Raghunathganj I |
PhysCompleted
Fin3.54519
|
35000 | ZP | Completed |
| 14 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Electrification work of Room at Ground floor of Guest house within the premises of Murshidabad Zilla Parishad |
2019-20 |
NIQ21/2019-20 · 05/11/2019
|
— | Berhampore |
PhysCompleted
Fin.56261 lakh
|
50000 | ZP | Completed |
| 15 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Supply of standard quality curtains for door of Conference Hall Murshidabad Zilla Parishad [73.14 sq.Mtr. |
2019-20 |
NIQ22/2019-20 ,Sl no-01 · 05/11/2019
|
— | Berhampore |
PhysCompleted
Fin1.38966 lakh
|
50000 | ZP | Completed |
| 16 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Renovation & Colour washing of Guest house at the top Floor of Panchanantala Market Complex ( 2nd Floor) within Murshidabad Zilla Parishad Office Building Premises, Berhampore,Murshidabad (Phase-II) |
2019-20 |
NIQ21/2019-20, Slno. 02 · 05/11/2019
|
— | Berhampore |
PhysOngoing
Fin.58507
|
50000 | ZP | Ongoing |
| 17 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Repairing of Room at Ground floor of Guest house within the premises Murshidabad Zilla Parishad |
2019-20 |
NIQ21/2019-20, Slno. 01 · 05/11/2019
|
— | Berhampore |
PhysCompleted
Fin—
|
.91999 | ZP | Completed |
| 18 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Supply of standard quality curtains for door of Conference Hall Murshidabad Zilla Parishad [Windows - 60.20 sq.Mtr. |
2019-20 |
NIQ22/2019-20 ,Sl no-02 · 05/11/2019
|
— | Berhampore |
PhysCompleted
Fin1.13176 lakh
|
50000 | ZP | Completed |
| 19 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Improvement of Guard wall in between near Khagraghat Railway Gate( Behampore Kandi Road) under Berhampore Block , Murshidabad |
2019-20 |
NIQ23/2019-20, Slno. 06 · 25/11/2019
|
— | Berhampore |
PhysCompleted
Fin1.29612 lakh
|
60000 | ZP | Completed |
| 20 |
Own Fund / Public Building Const
Previous
|
Repairing and Renovation of Amaipara Murshidabad Zilla Parishad Market Complex under Bahadurpur GP in M.J. Block |
2019-20 |
NIQ29/2019-20 ,Sl no 11 · 06/01/2020
|
— | M-J Block |
PhysOngoing
Fin27.51825 lakh
|
50000 | ZP | Ongoing |
| 21 |
Own Fund / Public Building Const
Previous
|
To provide the electrification work of Rakhal Das Bandapadhyay canteen and Meeting hall at Filature compound of MZP, Panchanantala, Murshidabad |
2019-20 |
NIQ55/2019-20 ,Sl.no 08 · 20/03/2020
|
— | Berhampore |
PhysOngoing
Fin3.86475 lakh
|
50000 | ZP | Ongoing |
| 22 |
Own Fund / Public Building Const
Previous
|
To provide the electrification work of kitchen block adjacent Rakhal Das Bandapadhyay cum Meeting hall at Filature compound of MZP, Panchanantala, Murshidabad |
2019-20 |
NIQ55/2019-20 ,Sl.no 07 · 20/03/2020
|
— | Berhampore |
PhysOngoing
Fin1.85934 lakh
|
50000 | ZP | Ongoing |
| 23 |
Own Fund / Public Building Const
Previous
|
To provide the electrification work of Toilet block adjacent Rakhal Das Bandapadhyay cum Meeting hall at Filature compound of MZP, Panchanantala, Murshidabad |
2019-20 |
NIQ55/2019-20 ,Sl.no 06 · 20/03/2020
|
— | Berhampore |
PhysOngoing
Fin.60102 lakh
|
50000 | ZP | Ongoing |
| 24 |
Own Fund / Public Building Const
Previous
|
Repair and Renovation of Quarter at Filature compound of MZP, Panchanantala, Murshidabad,[Quarter No. 06] Electrical Aspect and Branch Distribution system |
2019-20 |
NIQ55/2019-20 ,Sl.no 05 · 20/03/2020
|
— | Berhampore |
PhysOngoing
Fin1.15704 lakh
|
50000 | ZP | Ongoing |
| 25 |
Own Fund / Public Building Const
Previous
|
Repair and Renovation of Quarter at Filature compound of MZP, Panchanantala, Murshidabad,[Quarter No. 04] Electrical Aspect and Branch Distribution system |
2019-20 |
NIQ55/2019-20 ,Sl.no 04 · 20/03/2020
|
— | Berhampore |
PhysOngoing
Fin.71909 lakh
|
50000 | ZP | Ongoing |
| 26 |
Own Fund / Public Building Const
Previous
|
Repair and renovation of Quarter at Filature compound of MZP, Panchanantala, Murshidabad[Quarter no-03 [Electrical Aspect] |
2019-20 |
NIQ55/2019-20 ,Sl.no 03 · 20/03/2020
|
— | Berhampore |
PhysOngoing
Fin.54214 lakh
|
50000 | ZP | Ongoing |
| 27 |
Own Fund / Public Building Const
Previous
|
Repaqir and renovation of Quarter at Filature compound of MZP, Panchanantala, Murshidabad[ Quarter No-2] [Electrical Aspect] |
2019-20 |
NIQ55/2019-20 ,Sl.no 02 · 20/03/2020
|
— | Berhampore |
PhysOngoing
Fin.54214 lakh
|
50000 | ZP | Ongoing |
| 28 |
Own Fund / Public Building Const
Previous
|
To provide the supply and fitting fixing of 3 nos. Chandelier for Rakhal Das Bandapadhyay canteen cum meeting hall at Filature compound of MZP ,Panchanantala, Murshidabad (MAKE: JAQUAR PRODUCT CODE:93112,CELESTE GOLD FINISH PECTRA, WATTAGE: 12X5 WATT LED) |
2019-20 |
NIQ56/2019-20, sl no-01 · 20/03/2020
|
— | Berhampore |
PhysOngoing
Fin6.21810 lakh
|
50000 | ZP | Ongoing |
| 29 |
Own Fund / Public Building Const
Previous
|
Repairing of Lalgola Market Complex Toilet Block under G.P. & Block Lalgola.Murshidabad |
2019-20 |
NIQ20/2019-20 · 05/11/2019
|
— | Lalgola |
PhysOngoing
Fin1.88426 lakh
|
30000 | ZP | Ongoing |
| 30 |
Own Fund / Public Building Const
Previous
|
Repair and renovation of Quarter at Filature compound of Murshidabad Zilla Parishad, Panchanantala, Murshidabad [Quarter no: 04] Electrical wiring Part |
2019-20 |
NIQ45/2019-20,Sl.no 04 · 13/03/2020
|
— | Berhampore |
PhysOngoing
Fin.89253 lakh
|
50000 | ZP | Ongoing |
| 31 |
Own Fund / Public Building Const
Previous
|
Repair and renovation of Quarter at Filature compound of Murshidabad Zilla Parishad, Panchanantala, Murshidabad [Quarter no: 03[Electrical wiring Part |
2019-20 |
NIQ45/2019-20,Sl.no 03 · 13/03/2020
|
— | Berhampore |
PhysOngoing
Fin.63416
|
50000 | ZP | Ongoing |
| 32 |
Own Fund / Public Building Const
Previous
|
Repair and renovation of Quarter at Filature compound of Murshidabad Zilla Parishad, Panchanantala, Murshidabad [Quarter no: 02[Electrical wiring Part |
2019-20 |
NIQ45/2019-20,Sl.no 02 · 13/03/2020
|
— | Berhampore |
PhysOngoing
Fin.63416
|
50000 | ZP | Ongoing |
| 33 |
Own Fund / Public Building Const
Previous
|
Repair and renovation of Quarter at Filature compound of Murshidabad Zilla Parishad, Panchanantala, Murshidabad [Quarter no: 01[Electrical wiring Part |
2019-20 |
NIQ45/2019-20,Sl.no 01 · 05/03/2020
|
— | Berhampore |
PhysOngoing
Fin.79220 lakh
|
50000 | ZP | Ongoing |
| 34 |
Own Fund / Public Building Const
Previous
|
Construction of Market Complex along Berhampore Jalangi road in Murshidabad Zilla Parishad Compound (Part-C) (Block- G) DTDC gate to Karmatirtha Gate (45.00M) |
2019-20 |
NIQ03/2020-21,sl no 01 · 07/04/2020
|
— | Berhampore |
PhysOngoing
Fin32.60388 Lakhs
|
50000 | ZP | Ongoing |
| 35 |
Own Fund / Rest House/Conf. Hall Const
Previous
|
Repairing of Room at Ground floor of Guest house within the premises Murshidabad Zilla Parishad |
2019-20 |
NIQ21/2019-20, Slno. 01 · 05/11/2019
|
— | Berhampore |
PhysCompleted
Fin.91999 lakh
|
50000 | ZP | Completed |
| 36 |
Own Fund / Public Building Const
Previous
|
Renovation of the Sabhadhipati's Bunglow ,SAE(K) room,Driver's room at Murshidabad Zilla Parishad Office Premises.Berhampore.Murshidabad |
2019-20 |
NIQ12/2019-20 ,Sl no-1 · 09/08/2019
|
— | Berhampore |
PhysCompleted
Fin1.87066 lakh
|
50000 | ZP | Completed |
| 37 |
Own Fund / Public Building Const
Previous
|
Beautification in front of State Filature market Complex within Murshidabad Zilla Prishad Office Premises,Berhampore,Murshidabad |
2019-20 |
NIQ6/2019-20,sl no -01 · 27/05/2019
|
— | Berhampore |
PhysCompleted
Fin11.81230 lakhs
|
60000 | ZP | Completed |
| 38 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Construction of PCC road from Miknagar Kadamtala towards Madhab Chakraborty house under Chaityapur -II G,O, Beldanga-I Block. |
2018-19 | — | — | Beldanga-I |
Phys100%
Fin9.58
|
— | RMC, Murshidabad | Completed |
| 39 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Construction of Massonary Guard Wall at Duttapukur(East Side ) & side drain from Burigura to end of Kanai Sagar pukur with four nos crooss drain at Vill-Jhilli GP of Khargram Block Msd |
2018-19 | — | — | Khargram |
Phys100%
Fin4.90
|
— | RMC, Murshidabad | Completed |
| 40 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Construction of culvert near Durgatala Daspara Monasatala under Sompara-ii GP and Beldanga-ii Msd. |
2018-19 | — | — | Beldanga-II |
Phys100%
Fin10.69
|
— | RMC, Murshidabad | Completed |
| 41 |
Own Fund / Morrum/Concrete Road const.
Previous
|
constration of C.C.Road from Esserpara Inser Doken towords Kabarkhana at Chak Islampur GP under Raninagar-i Block Msd. |
2018-19 | — | — | Raninagar-I |
Phys100%
Fin11.53
|
— | RMC, Murshidabad | Completed |
| 42 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Constration of road from Baruipur Nabajiban Club's pitch road to Kashem's more at Baruipara, Khidirpur GP, Hariharpara Block,Msd.Msd. |
2018-19 | — | — | Hariharpara |
Phys100%
Fin14.01
|
— | RMC, Murshidabad | Completed |
| 43 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Constration of Black top Road towards Bhagar Sumserganj Block, Msd.FT A/C Fund |
2018-19 | — | — | Samserganj |
Phys100%
Fin27.22
|
— | RMC, Murshidabad | Completed |
| 44 |
Own Fund / Public Building Const
Previous
|
Construction of Guard Room within Murshidabad Zilla Parishad Office Premises,Murshidabad |
2018-19 |
NIQQuotation · 27/08/2019
|
— | Berhampore |
PhysCompleted
Fin.25047 lakh
|
N/A | ZP | Completed |
| 45 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Construction of Cement Concrete Road starting from Gopalnagar Kashem SK. House at Gopalnagar village at Hizole GP under Kandi Block. |
2017-18 | — | — | Kandi |
Phys100%
Fin5
|
— | RMC, Murshidabad | Completed |
| 46 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Construction of road prtective Wall at Nischantapur Bhangla pond under Mahula-2 GP under Beldanga-I Block. |
2017-18 | — | — | Beldanga-I |
Phys100%
Fin1.64
|
— | RMC, Murshidabad | Completed |
| 47 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Construction of Cement Concrete Road stating from Khosbaspur Baro Culvert to Khosbuspur Pry. School at Gokarna-II GP under Kandi Block. |
2017-18 | — | — | Kandi |
Phys100%
Fin0
|
— | RMC, Murshidabad | Completed |
| 48 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Constration Of Cement Concrete Road From Dhiren Hazra house towards union Bank at Kundal under Kalyanpur-II GP in Burwan Block, Msd (Chanage 219 m to 435m.) |
2017-18 | — | — | Burwan |
Phys100%
Fin1.659
|
— | RMC, Murshidabad | Completed |
| 49 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Balance work of construction of Two nos. changing room with toilet facility at Basia under Guru Pasla GP in Nabagram Block |
2017-18 | — | — | Nabagram |
Phys100%
Fin0
|
— | RMC, Murshidabad | Completed |
| 50 |
Own Fund / Morrum/Concrete Road const.
Previous
|
Improvement of Cement Concrete Road Starting from Saspara Main Road at Ajay SK house at Andula GP under Kandi Block. |
2017-18 | — | — | Kandi |
Phys100%
Fin5
|
— | RMC, Murshidabad | Completed |